ASC X12 855 PO Acknowledgment (BAK / ACK) & 3PL Warehouse Flows
While a 997/999 only confirms X12 syntax receipt, an 855 communicates commercial seller commitment: accepted as-is, backordered, price/date amended, or rejected.
High-Frequency BAK-02 Header & ACK-01 Line Codes
| Coordinate | Code | Commercial Meaning |
|---|---|---|
BAK-02 | AD / AC / RD | AD = Accepted with No Detail Change; AC = Acknowledge With Detail & Change; RD = Reject with Detail. |
ACK-01 | IA | Item Accepted (ships as ordered). |
ACK-01 | IB / IC | IB = Item Backordered (check ACK-04/05 estimated ship date); IC = Item Accepted — Changes Made. |
ACK-01 | IQ / IP / IR | IQ = Quantity Changed; IP = Price Changed; IR = Item Rejected. |
Frequently Asked Engineering Questions
How do 940 and 945 fit alongside 850, 855, and 856?
When a brand uses a third-party logistics (3PL) warehouse, the ERP converts an accepted 850 into a 940 Warehouse Shipping Order sent to the 3PL; once the 3PL ships the parcel/LTL pallet, it returns a 945 Warehouse Shipping Advice, which the ERP translates into the customer-facing 856 ASN and 810 Invoice.
Inspect, Diff, Validate & Scrub This Payload Offline in Your JetBrains IDE
Never paste regulated healthcare PHI (837/835/271) or supply-chain payloads (850/ORDERS) into browser parsers. EdiPrism X12 EDIFACT runs 100% air-gapped inside IntelliJ IDEA, PyCharm, DataGrip, Rider, GoLand, and WebStorm with a free core tier and a 14-day [Pro] trial.